New server rack needed as old one is out of room ==> 100% complete
Proposal
Upgrade to a new network server rack as the current one is completely filled.
Steps to complete
-
Purchase, receive, and assemble the rack (NavePoint 15U rack) -
Migrate all cables in ceiling to single point of entry into server room -
Label all power cables for each item in old rack -
Label all ethernet cables inside of old rack -
Acquire and install UniFi USP-PDU-Pro for power -
Remove old UPSs -
Disassemble old rack -
Thoroughly test and ensure all equipment is functioning and all cables can reach where they are intended to reach -
Install all existing equipment into new rack -
Configure PDU Pro and ensure it is working properly -
Build a box to put under the rack for storage -
Document everything
Edited by Simple Nomad